Road work January 2023
Thanks to all who contriuted both during 2021 and 2022 and those who responded to our note in December 2022.
We did some work on the road in January 2023.
Spread 34 loads of gravel, level and pack with an excavator.
Here is a link to a driving tour over the road showing the new (coarse gravel) sections.
Driving tour of the road January 2023.
Hey folks;
December, 2022
Dear New Elm Lot Owners;
Hoping this note finds everyone well.
A brief update about our road since September 2021.
Our most recent road work was in 2020. We intended to do some significant work this year (2022) but did not do so yet. Ian is coordinating some work now and so we are sending a quick update and offering opportunity to contribute and increase the amount of work we can get done. Recognize this is short notice and a short note; three of us have already promised to contribute immediately; we have some cost advantage because the contractor has equipment on-site on another job.
The beaver battle continues and the pond is over-flowing the road once again. We are looking at options including a renewed culvert and road work and perhaps some re-location service for the beavers. We expect to do something about the beaver and overflow of the road also before it freezes up.
Our historical annual contribution of $400 or biannual (double) contribution of $800 per lot per year has enabled the work done so far. We can put a double contribution to good use this fall if you are able to contribute; every bit helps. We plan to fill pot-holes on the newer sections with gravel then begin at the outer end of the new sections and run until the money runs out.
Please tell Ian or Bob when you deposit in our account just so we can keep track of who contributed because the bank statement doesn't say. We keep all un-spent contributions in the bank ($5,089.34 today) which neither earns interest nor incurs fees. There are now 16 of us owning 18 lots between us. We are all in this together and voluntarily.
Bank account remains the same as last time:
Scotiabank: LAHAVE STREET, PO BOX 400 BRIDGEWATER NOVA SCOTIA B4V 2X6
Your account number: 71613 04928 25
Account holder: Robert Allan and Ian Goldsmith (ITF New Elm Estates Lot Owners Road).
Reporting our contribution and costs for 2022 to date:
2021-09-03 Open |
$1,189.34 |
2021/2022 contributions to date |
$3,900.00 |
2021/2022 Costs |
$0.00 |
2022-12-19 Balance |
$5,089.34 |
Note: Bob loan remaining $2400 (reduce by $800 contribution 2022) |
As always, we’re in it together so please tell us your suggestions on how or what we should do together.
Bob Allan and Ian Goldsmith
Bob Allan cell: 902-497-9674 Ian Goldsmith cell 902 521-5552
Bob's Home Page
- Details
- Written by Bob Allan
- Category: Allan Family
- Hits: 4792
Welcome to Bob Allan's personal web space.
You can learn a bit about me and my family in Bob Allan's World.
Folks interested in the New Elm Estates road stuff can follow that link to a short article.