A brief history of the work on the road

Here is a brief history of the recent work on the road.  See the article at the 2013 season road work.

Work before 2010

Some of the lot owners had some work done on parts of the road now and again. Thanks to all who contributed; but, we don't have any records of that so we will begin our tale with the 2010 season. We opened a bank account and started to pool our resources in the fall (October) of 2009 in preparation for the 2010 work.

The 2010 season work

We contracted with Darrell Naugler to patch a number bad spots on the road. Here's what we bought.

15 loads shale (180 yards)......2100.00
moving dozer............................65.00
5.5 hours dozing......................357.50
15.12 tons Class A....................256.64
HST........................................361.29
total......................................3140.43

The 2011 season work

The residents started an upgrading of New Elm Estates Drive beginning at (near) the intersection with Long Cove Road.

We used a new building/upgrading approach this year.

The method is:

Here's a photo of the beginning of that piece of updated road; it is much more smooth and dry and seems to hold up well (writing this in August, 2013).

New road surface.

We contracted Darrrell Naugler to do the work.

The work was:

We did some woods work to clear back from the edge of the road surface. We clear the trees back from the road surface far enough for:

The 2012 season work

We contracted more road surface upgrade using the same method as 2012.

We collected $3600 from 7 owners of 9 lots ($400. per lot).

We contracted Darrrell Naugler to do the work.

The work was:

The residents did some woods work to clear back from the road surface.